This action allows the IACUC Administrator to designate the IACUC protocol as one that does not require an IACUC review. Institutions might allow the investigator to specify during protocol submission that the protocol does not require an IACUC review or have the IACUC Administrator change the protocol review type after protocol submission to indicate the same.
|
Action attributes |
Description |
|
Who can perform action |
IACUC Administrators are allowed to perform this action. |
|
Protocol state prior to action |
Prior to the action being performed, the protocol must be in the following state: The Assign to Committee and Schedule action must have been performed The submission review type must be IACUC Review not required The protocol status must be in Submitted to IACUC The submission status can be in any state |
|
Protocol state after action |
After the action is performed The protocol status changes to IACUC Review Not Required The submission status changes to IACUC Review Not Required |
|
Field |
Description |
|
Decision Date |
Specify
the date you the decision to take this action was made. By default,
the field displays the current date. To change it, click the
calendar |
|
Comments |
To enter textual information to describe this action,
click within the text box (or press the tab |
|
Action Date |
Specify the date you want this action to become
effective. By default, the field displays the current date. To
change it, click the calendar |
|
Review Comments |
|