The subaward is $75,000 annual direct costs plus 65% F&A, or $48,750, for a total of $123,750.
This is the common situation in which the first period costs of the subcontract exceed $25,000. Three line items are needed in the first period, and two in the following periods.
Period 1
Period 2
Period 3